National Repository of Grey Literature 10 records found  Search took 0.01 seconds. 
Revitalization Program of Floral Garden in Kromeriz
Hlavová, Michala ; Sochor, Jan (referee) ; Ponešová, Barbora (advisor)
From Čestný dvůr to level of kolonnaide, where was the original entry. Line objekt along the wall. Three objects=three functins. Exhibition space, library with study room, new tropical glasshouse. Hollandaisse and Orange garden split based on next.door axes.
Revitalization Program of Floral Garden in Kromeriz
Doležel, Martin ; Sochor, Jan (referee) ; Ponešová, Barbora (advisor)
THE GARDEN IN A CRISIS The first problem. Moving the entrance from the rotunda axis in the north to the area where the farmyard surrounded by greenhouses is situated. The consequence of this step was destruction of the conception of a floral garden and further, confusion of a visitor caused by the new and excentric garden entrance. The second problem. The original noble fill of the forefield has been perfectly cleaned, including the structure. Therefore the courtyard of honour is wedged in the two huge unspecific areas. The third problem. The nineteenth century is gone. Nowadays visitor is hard to please and unconcentrated. THE CONCEPTION Revitalisation and amendment of the forefield structure concept in subareas is both practical and it offers the esthetic quality which was lost. In relation to the axis of the garden, the area is adversely divided by some new buildings. These functional stripes make the optical barriers and they are clear in their axis. There are minimaly two six smaller areas created out of two bigger ones. Moving the main entrance from the courtyard to the rotunda center line means a possibility for the garden to step out towards its future development without some drastic changes in a objects which are part of a monument conservation but not functionally defined any more. The more, the garden gets its lost axiality, sense and a story about men's journey again. The application of the principles of the baroque garden in filling of the forefield gardens is either wrong or not considered properly. Polarized (and polar) gardens offer extreme positions of two contradictory trends. A superframed garden made by the nowadays technology versus a grove of wisdom where the nature is both a constructor and an architect. All of this with a baroque garden somewhere in its centre.
Monitoring and calibration of machine tools and coordinate measuring machines
Žák, František ; Vetiška, Jan (referee) ; Holub, Michal (advisor)
This is a bachelor´s thesis concerning the retrieval of monitoring and calibration of machine tools and coordinate measuring machines, used in many different industries. The main points of the work is introduction to different measurement procedures according to standards, calibration procedures and their application.
Residential complex Brno Holasky, V Aleji locality
Čeleda, Jan ; Kopáčik, Gabriel (referee) ; Sátora, Josef (advisor)
The aim of urban concept is cadastral area of Brno – Holásky. This area is designated area for development in spatial plan for the city of Brno. Area is designated for housing, social care and education. The area has size of 42ha and it is defined by the railway in the east. From the south hit is V Aleji and U potoka street. The border continues along road towards shopping mall Olympia. The west border is consists by Holásky lakes. In the north the border goes through structure between V Aleji street and Ledárenská street. The area is relatively attractive mainly due the close connection nature sight Holásky lakes. Also interesting is location within the city of Brno. Altough the area is located outside the larger city center, there is a good accessibility to the center. The new residential housing area provides space for approximately 1400 inhabitants. The structure and vertical articulation is based on response of the surrounding buildings. The V Aleji street defines an axis that helps to create new space for central square. Another axis it the road from the V Aleji street towards Holasky lakes. This is major line connecting residential area and the surrounding with the area of lakes. This street also devide the area into two parts. Right part, northern, consisting with coherent block with dimension of 200x300 metres. Outside part of the block consists of blocks of flats. The inner part is filled with family houses and public space belonging to blocks of flats. Part of the block is also elderly house. The left, southern, part concludes the L shape block of current housing. Again the edge of block is formed by blocks of flats and family houses in inner part. At the end of the axis heading to Holasky lakes is kindergarten in direct relation to natural park. Next to the Holásky lakes there will be space for sports and recreation. Will include beach volley, football and wooden pier on lake. In this part also will starts cycling path to the city center. Stationar
Evaluation of Control Measuring Machine (CMM) and Coordinate Measuring Machines (CMMs).
Dolák, David ; Pavlík, Jan (referee) ; Opl, Miroslav (advisor)
This is a bachelor´s thesis concerning the retrieval of coordinate measuring maschines used in many different industries, in the science, but in medicine also. The main structure of the work consist of familiarization with these machines, thein history and construction. Conclusion of the work is devoted to areas where these machines can be found and current trends to be concerned with this problems.
Revitalization Program of Floral Garden in Kromeriz
Doležel, Martin ; Sochor, Jan (referee) ; Ponešová, Barbora (advisor)
THE GARDEN IN A CRISIS The first problem. Moving the entrance from the rotunda axis in the north to the area where the farmyard surrounded by greenhouses is situated. The consequence of this step was destruction of the conception of a floral garden and further, confusion of a visitor caused by the new and excentric garden entrance. The second problem. The original noble fill of the forefield has been perfectly cleaned, including the structure. Therefore the courtyard of honour is wedged in the two huge unspecific areas. The third problem. The nineteenth century is gone. Nowadays visitor is hard to please and unconcentrated. THE CONCEPTION Revitalisation and amendment of the forefield structure concept in subareas is both practical and it offers the esthetic quality which was lost. In relation to the axis of the garden, the area is adversely divided by some new buildings. These functional stripes make the optical barriers and they are clear in their axis. There are minimaly two six smaller areas created out of two bigger ones. Moving the main entrance from the courtyard to the rotunda center line means a possibility for the garden to step out towards its future development without some drastic changes in a objects which are part of a monument conservation but not functionally defined any more. The more, the garden gets its lost axiality, sense and a story about men's journey again. The application of the principles of the baroque garden in filling of the forefield gardens is either wrong or not considered properly. Polarized (and polar) gardens offer extreme positions of two contradictory trends. A superframed garden made by the nowadays technology versus a grove of wisdom where the nature is both a constructor and an architect. All of this with a baroque garden somewhere in its centre.
Revitalization Program of Floral Garden in Kromeriz
Hlavová, Michala ; Sochor, Jan (referee) ; Ponešová, Barbora (advisor)
From Čestný dvůr to level of kolonnaide, where was the original entry. Line objekt along the wall. Three objects=three functins. Exhibition space, library with study room, new tropical glasshouse. Hollandaisse and Orange garden split based on next.door axes.
Residential complex Brno Holasky, V Aleji locality
Čeleda, Jan ; Kopáčik, Gabriel (referee) ; Sátora, Josef (advisor)
The aim of urban concept is cadastral area of Brno – Holásky. This area is designated area for development in spatial plan for the city of Brno. Area is designated for housing, social care and education. The area has size of 42ha and it is defined by the railway in the east. From the south hit is V Aleji and U potoka street. The border continues along road towards shopping mall Olympia. The west border is consists by Holásky lakes. In the north the border goes through structure between V Aleji street and Ledárenská street. The area is relatively attractive mainly due the close connection nature sight Holásky lakes. Also interesting is location within the city of Brno. Altough the area is located outside the larger city center, there is a good accessibility to the center. The new residential housing area provides space for approximately 1400 inhabitants. The structure and vertical articulation is based on response of the surrounding buildings. The V Aleji street defines an axis that helps to create new space for central square. Another axis it the road from the V Aleji street towards Holasky lakes. This is major line connecting residential area and the surrounding with the area of lakes. This street also devide the area into two parts. Right part, northern, consisting with coherent block with dimension of 200x300 metres. Outside part of the block consists of blocks of flats. The inner part is filled with family houses and public space belonging to blocks of flats. Part of the block is also elderly house. The left, southern, part concludes the L shape block of current housing. Again the edge of block is formed by blocks of flats and family houses in inner part. At the end of the axis heading to Holasky lakes is kindergarten in direct relation to natural park. Next to the Holásky lakes there will be space for sports and recreation. Will include beach volley, football and wooden pier on lake. In this part also will starts cycling path to the city center. Stationar
Monitoring and calibration of machine tools and coordinate measuring machines
Žák, František ; Vetiška, Jan (referee) ; Holub, Michal (advisor)
This is a bachelor´s thesis concerning the retrieval of monitoring and calibration of machine tools and coordinate measuring machines, used in many different industries. The main points of the work is introduction to different measurement procedures according to standards, calibration procedures and their application.
Evaluation of Control Measuring Machine (CMM) and Coordinate Measuring Machines (CMMs).
Dolák, David ; Pavlík, Jan (referee) ; Opl, Miroslav (advisor)
This is a bachelor´s thesis concerning the retrieval of coordinate measuring maschines used in many different industries, in the science, but in medicine also. The main structure of the work consist of familiarization with these machines, thein history and construction. Conclusion of the work is devoted to areas where these machines can be found and current trends to be concerned with this problems.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.